project brief


innovative process
The challenge
Aging infrastructure and exposure to high wind, corrosion, and environmental factors had compromised the stability of the 132kV transmission line. TCN required urgent structural reinforcement to prevent line failures and ensure continuous power delivery to the national grid.
project goals
Electro Domain was contracted by the Transmission Company of Nigeria (TCN) to carry out the structural fortification of a critical 132kV transmission line segment, aimed at enhancing system reliability and mitigating risks from environmental stressors.
Project Scope
the result
The project was successfully executed with zero safety incidents. The fortification significantly increased the resilience and performance of TCN’s transmission network. It reduced the risk of line failures, improved power delivery continuity, and contributed to the overall stability of the national grid.